Stage 0: Mission Setup & Screen Recording
Track: Version 1 (Major Trauma ED & UTC)
Outputs to Produce:
- Select your assessment scenario track from the dropdown above.
- Grant Google Chrome permission to record your Entire Screen (so your Excel/Google Sheets navigation is captured).
- Ensure your microphone is enabled and test the audio meter below.
Resources:
Screen Sharing:
Not Connected
Microphone Audio:
Not Connected
Exercise 1: Rollout Data Tracker (20 Minutes)
Concurrent multi-site implementation analysis.
Outputs to Produce:
- Go-Live Readiness %: Calculate total completion % vs. Critical Path completion % for each Trust.
- Top 3 Compounding Blockers: Identify the 3 critical path blockers across estates, IT, and suppliers.
- Immediate Tactical Mitigations: List specific actions you will take today before 17:00.
- Executive RAG Summary Table: Construct a 3-row leadership summary table (Trust | RAG | Justification | Action).
ℹ️ How it works: Open your spreadsheet (Google Sheets or Excel) on your screen. Your screen recording captures your live spreadsheet work. Enter your final outputs below.
Dataset Resources:
3 Concurrent Trusts: Trust A (T-5d), Trust B (T-14d), Trust C (T-28d)Your Outputs:
Exercise 2A: Kiosk Bug Testing & Root-Cause Isolation (5 Minutes)
Live app defect investigation in an Urgent Treatment Centre.
Outputs to Produce:
- Test the check-in flow on the virtual kiosk simulator (compare a minor injury vs. the defect pathway).
- Isolate the technical root cause across: Hardware, Hospital Wi-Fi/Network, Clinical Pathway Logic, and EHR/HL7 Gateway.
- Formulate the DCB0160 Clinical Safety Hazard (the specific waiting room patient risk).
KIOSK-01 (UAT Simulator)
Hospital VLAN (Connected)
Thermal Printer: Ready
Device Network & Event Log
Ready
[SYSTEM] App version: v4.12.2-rc3 booted.
[NETWORK] Health Gateway ping: 14ms (200 OK).
Exercise 2B: Jira Engineering Bug Ticket (5 Minutes)
Escalate the P1 defect to Huma's software and integration engineers.
Outputs to Produce:
- Write a structured P1 Blocker / Clinical Safety bug ticket for Engineering.
- Specify the exact reproduction path, error log, observed result, and required fail-safe behavior.
Diagnostic Evidence From Kiosk:
Uncaught (in promise) TimeoutError: Gateway did not ACK HL7 message type ORU_R01 within 10000ms.
Your Output: Jira Ticket Fields:
Exercise 2C: ED Matron Stakeholder Update (5 Minutes)
Clinical de-escalation and transparent incident communication.
Outputs to Produce:
- Draft an immediate written update (Email / Teams message) to the distressed ED Matron.
- Validate her clinical safety concerns without defensive technical jargon.
- Explain what worked vs. what failed, state the immediate engineering hotfix, and invite her to a joint test tomorrow.
Recipient Profile:
Sister Brenda Higgins (Band 8a ED Matron) •
Status: Demanding rollout be halted due to symptom freeze.
Your Output: Written Update to Matron:
Exercise 3A: Go-Live Crisis – Clinical Pushback & Roleplay (7 Minutes)
T-44 hours to go-live: acute clinical rebellion in an overcrowded ED.
Outputs to Produce:
- Spoken Verbal Response: Speak out loud to your screen recording to de-escalate the Matron.
- Acknowledge OPEL 4 / black alert conditions, validate nurse burnout, and address waiting room safety.
- Propose practical change adoption solutions (e.g. Huma floorwalkers at the door, micro-training at shift handovers).
- Record your strategic notes and commitments below.
Stakeholder Statement:
Sister Brenda Higgins says:
"Look, I don't care what your commercial director agreed with our Chief Executive. Have you looked out there into my waiting room? We have 60 patients waiting, 14 ambulances queued outside, and I've got nurses in tears. Now your contractor tells me he has the wrong metal brackets, and your boxes are in my way. Monday morning is completely off the table. Take your machines and come back next year."
Exercise 3B: Go-Live Crisis – Supplier Control & Sunday Gate (8 Minutes)
Resolve hardware blocker and establish objective go/no-go criteria.
Outputs to Produce:
- "The Enforcer" Supplier Recovery Plan: State immediate actions to resolve the hardware mounting failure with the supplier and Estates before Monday.
- Sunday 16:00 Go / No-Go Decision Gate: Define non-negotiable objective criteria required by Sunday afternoon to proceed with go-live.
Hardware Blocker Brief:
The installation contractor unpacked the kiosks and found 75mm brackets instead of the custom 100mm heavy-duty anti-tamper brackets required for hospital drywall. His shift ends at 15:00 today. Kiosks are unmounted.
Your Outputs:
Stage 7: Results & Gemini Evaluation Prompt
Download your recording and copy your tailored multimodal evaluation prompt.
Outputs to Produce:
- Download your `.webm` screen and audio recording below.
- Copy the generated multimodal evaluation prompt.
- Open Google Gemini, attach your video file, paste the prompt, and submit to receive your score (1–5) and coaching report.
Screen Recording Playback:
No video recording generated (Dry Run mode). You can still copy the prompt on the right.